As we work through the project to refit Pagan to suit our requirements, this page will keep track of progress in brief with links to the blog posts concerned
2 Jul 2016 - The Naked Pagan
Sprayhood and cockpit tent window replacement
Cost £200.00 (Blue Marine, Battlesbridge)
Jul / Aug / Sep 2016 Hull & sterngear
Replace cutlass bearing and shaft seal.
Remove failed epoxy below waterline, new epoxy coating.
Repaint topsides, new graphics and antifoul
Cost £1200 app (materials etc.)
Oct 2016 - Heating
Install 4kw Webasto blown air heating system with vents in forecabin, heads, saloon, cockpit and aft cabin
Cost £2,200
Oct 2016 - Upgrade VHF and AIS systems
Install new primary VHF set with remote command mic, replace main VHF antenna, fit AIS antenna on mizzen
Cost £580
Apr 2017 - New heads, holding tank and pipework
Refit heads locker with new shelving and supports for a 25 litre holding tank
Install holding tank, vents, deck fitting and outlet valve
Fit a diverter valve to select between seawater and fresh water flush with protection from contamination
Replace toilet bowl and pump with new unit
Cost £560
April 2017 - Refrigerator refurbishment
Removal of old compressor, coiling coil and evaporator plate
Install new compressor, coiling coil and evaporator plate
Make good fridge box installation
Cost £379.95 (note: the kit was purchased 10 months ago and the current price is now £526.15! We saved £146.20 by ordering it and putting it by)
May 2017 - Replacement Autohelm
Removal of old Cetrex control head and motor
Install new Raymarine EV-100 wheel pilot system
Cost £1,200 approx
No comments:
Post a Comment