"To Do" list

Major page changes a work in progress, come back (much) later!

Nb. "tbd" - to be decided, "dtf" - details to follow

Work in Progress

  •  V-berth refit
    •  Strip out old headlining
    •  Clean up internal surfaces
    •  Insulate throughout
    •  Make and fit plywood lining panels
    •  Trim out linings
    •  Prepare all areas previously lined with vinyl for painting
    •  Paint those areas
    •  Make and fit new lockers & shelving
      •  Fit supporting framework using utile hardwood from stock
      •  Measure and cut (first cut or finished as appropriate) ply locker facings etc.
      •  Veneer ply with "tiger stripe" Sapele veneer
      •  Finish cut locker fronts, doors etc.
      •  Fit and finish
      •  Varnish
    •  Electrics
      •  Install 240v sockets in port and starboard shelves
      •  Install 12v USB sockets ditto
      •  Install 2x reading lights and 1x overhead light (white/red swtichable)
    •  Prepare and varnish existing wood finish areas
    •  Prepare and paint (or otherwise improve) sole
    •  Make and fit deadlights for portholes
    •  Make and fit insulated and uninsulated inserts for hatch
    •  Refurbish wardrobe interior
  •  Galley
    •  Order parts needed to replace cooker
    •  Remove existing cooker
    •  Make and fit new fold away worktop
    •  Make good old gimbal cutouts
    •  Measure, make and fit new gimbal mounting pads
    •  Fit replacement cooker
    •  Gas leak test

Provisional full list  (this will be prioritised and rearranged!)

  •  Heads
    •  Remove and replace headlining
    •  Replace tap/shower head
    •  Repair / revise holding tank plumbing
      •  Replace broken flish source selector valve
      •  Install tank / overboard diverter valve
    •  Cobble together means of pumping out tank to portable disposal tank
    •  Solve problem of water leaking out into saloon when showering
    •  Fit shelving in locker below sink
    •  Replace or remove faulty light above mirror
    •  Fit extractor fan to deck vent
    •  Prepare and varnish all woodwork
    •  Obscure porthole for privacy
  •  Saloon
    •  Deckhead
      •  Insulation
      •  Refurbish or replace headlining panels (tbd)
      •  Remove and replace cabin side vinyl linings (dtf)
      •  Repair / refurbish window internal frames
    •  Consider improvements to overhead lockers
    •  Repair and improve pull out double frame
    •  Repair and improve slots and boards for sea berths
    •  Replace saloon upholstery
    •  Refurbish saloon hanging locker
    •  Cabin Sole
      •  Create storage compartments to either side of bilge
      •  Remake or replace cabin sole plates to suit
    • Rebuild companionway step to improve storage (safety gear &c.)
  •  12v Electrical Supply
    •  Batteries
      •  Install secondary battery bank (non-essential - domestic &c.)
      •  Make and fit new battery selector switch panel
      •  Amend and replace mains and engine charging as appropriate
    •  Solar
      •  Install permanent solar panels on hatch garage and aft cabin deck
      •  Fittings and wiring for deployable foldaway panels on cabin top
      •  Charge controller(s) as appropriate
    •  Wind
      •  Fit wind turbine on mizzen mast
      •  Wiring and control as required
  •  Bower Anchor
      •  Electric anchor windlass
        •  Remove manual windlass and offer for sale
        •  Run heavy duty cabling to location from new secondary battery bank
        •  Install electric anchor windlass
    •  New chain & rode
    •  New best bower anchor
    •  Investigate sealing chain locker from bilge and fitting dedicated drains

Pagan - First

  •  Engine Bay
    •  Install and plumb in Calorifier
    •  Install engine bay fire extinguisher(s)
    •  Install engine bay tube heater(s)
    •  Engine
      •  Screw fuel filter back to bulkhead!
      •  Free off throttle cable
      •  Fault find oil pressure and temperature gauges
      •  Replace engine glow plugs with Fast-start type
      •  Service engine
  •  Cockpit locker hinges - fettle
  •  Stanchion bases - fettle loose base, check rest
  •  Starboard cockpit locker
    •  Run pipework / ducting as necessary through to galley
    •  Install 88l diesel tank
    •  Make and fit shelf for fridge and freezer compressors
    •  Relocate fresh water pump (to engine bay?)
  •  Galley
    •  Replace fridge compressor and evaporator plate
    •  Oven Gimbal Lock
    •  Gas detector
    •  Kitchen roll holder
    •  Fit and plumb in new tap
  •  Heating
    •  Run ducting to vents
    •  Fit vents in forecabin, heads, saloon, cockpit and aft cabin
    •  Install heater in port cockpit locker
    •  Plumb in fuel supply
    •  Install wiring harness
    •  Commission & test heating system
    •  Secure all ducting and lag joints
  •  Heads
    •  Install holding tank
    •  Install fresh water flush tank
    •  Install and plumb in tap / shower head
  •  Fix leak(s) in deckhead above V-berth
  •  Install TackTick NMEA interface and fluxgate compass
  •  Install Tacktick mounting plates above chart table
  •  Gash storage
  •  Bilge pumps
    •  Repair or replace manual bilge pump
    •  Fit automatic electric bilge pump in engine bilge
    •  Prevent routine water flow from engine bilge to main bilge (if necessary)
    •  Fit larger automatic electric bilge pump in main bilge
  •  Safety
    •  Harness eyes
    •  Fire extinguishers
    •  Jacklines
  •  Rig
    •  Mizzen mast gate
    •  Strengthen rigging attachments cockpit
    •  Stbd aft lower chainplate crack
    •  Remove and re-bed all chainplates
    •  Repair crack aft of mast step
    •  Replace standing rigging
    •  Replace kicking strap
    •  Genoa UV strip
    •  Main & Mizzen Stack Packs
  •  Repairs
    •  Replace diesel filler deck fitting
    •  Repair floor under saloon table
    •  Replace engine hatch bolts
    •  Re-bed and secure pulpit rail
    •  Clean out bilges & inspect keel bolts
    •  Sprayhood & cover windows
    •  Replace bicolour on bow
  •  Navigation
    •  Replace AIS antenna
    •  Replace main VHF antenna
    •  Install new main VHF set
    •  Install PA horn
    •  Replace rail mount VHF antenna
    •  Replace main mast antenna cables
    •  Remove Cetrex autopilot inc. motor and chain drive
    •  Install EV100 Wheelpilot
  •  Replace main water tank
    •  Remove old stainless tank
    •  Measure up and order new plastic tank(s)
    •  Install new tank(s)
    •  Secure tank to prevent movement

Pagan - Next


  •  Fit intake water strainer
  •  Saloon cushions
  •  Vent with fan above galley
  •  Port cockpit locker
    •  Petrol storage locker
  •  Lead mainsail lines back to cockpit
    •  Modify hatch garage coaming
    •  Install turning blocks at mast base
    •  Install deck organisers
    •  Install clutch banks
    •  Install winches on cabin top port & stbd
  •  Dehumidifier
  •  Saloon bookcase
  •  TV system
  •  Repair or replace cockpit duckboards
  •  Revamp electrical system
    •  Revise position &c of mains sockets
    •  Install USB charging points as req.
    •  Make new switch panel
    •  Install tank gauges
  •  Refurbish saloon sole plates

Pagan - Whenever

  •  Replace cooker
  •  Revamp saloon table
  •  Refit aft cabin
  •  Purchase inflatable sailing tender (DingyGO)

Done!

  •  Lift out 2016
    •  Remove rudder
    •  Remove prop
    •  Remove windvane
    •  Replace Cutlass bearing
    •  Fit PSS gland in place of stuffing box
    •  Hull
      •  Remove old antifoul (scrape or use a chemical stripper)
      •  Make good any gelcoat damage etc
      •  Repair crack at aft end of keel
      •  Wet sand hull to a good finish
      •  Apply two coats of Hempel High Protect epoxy
      •  Apply one coat of Hempel light primer epoxy
      •  Apply Hempel hard racing antifoul
    •  Make good where windvane self steering was fitted
    •  Refit stern tube
    •  Refit shaft, cutlass bearing and Install PSS gland
    •  Repitch prop
    •  Refit prop
    •  Refit rudder
    •  Replace prop anode
    •  Repaint topsides
    •  Apply graphics and cove line
    •  Paint boottop
  •  Convert to Propane gas
  •  Upgrade C80 software
  •  Investigate source of fresh water in bilges
Boom Brake / Gybe Preventer

No comments:

Post a Comment