Major page changes a work in progress, come back (much) later!
Nb. "tbd" - to be decided, "dtf" - details to follow
Work in Progress
- V-berth refit
- Strip out old headlining
- Clean up internal surfaces
- Insulate throughout
- Make and fit plywood lining panels
- Trim out linings
- Prepare all areas previously lined with vinyl for painting
- Paint those areas
- Make and fit new lockers & shelving
- Fit supporting framework using utile hardwood from stock
- Measure and cut (first cut or finished as appropriate) ply locker facings etc.
- Veneer ply with "tiger stripe" Sapele veneer
- Finish cut locker fronts, doors etc.
- Fit and finish
- Varnish
- Electrics
- Install 240v sockets in port and starboard shelves
- Install 12v USB sockets ditto
- Install 2x reading lights and 1x overhead light (white/red swtichable)
- Prepare and varnish existing wood finish areas
- Prepare and paint (or otherwise improve) sole
- Make and fit deadlights for portholes
- Make and fit insulated and uninsulated inserts for hatch
- Refurbish wardrobe interior
- Galley
- Order parts needed to replace cooker
- Remove existing cooker
- Make and fit new fold away worktop
- Make good old gimbal cutouts
- Measure, make and fit new gimbal mounting pads
- Fit replacement cooker
- Gas leak test
Provisional full list (this will be prioritised and rearranged!)
- Heads
- Remove and replace headlining
- Replace tap/shower head
- Repair / revise holding tank plumbing
- Replace broken flish source selector valve
- Install tank / overboard diverter valve
- Cobble together means of pumping out tank to portable disposal tank
- Solve problem of water leaking out into saloon when showering
- Fit shelving in locker below sink
- Replace or remove faulty light above mirror
- Fit extractor fan to deck vent
- Prepare and varnish all woodwork
- Obscure porthole for privacy
- Saloon
- Deckhead
- Insulation
- Refurbish or replace headlining panels (tbd)
- Remove and replace cabin side vinyl linings (dtf)
- Repair / refurbish window internal frames
- Consider improvements to overhead lockers
- Repair and improve pull out double frame
- Repair and improve slots and boards for sea berths
- Replace saloon upholstery
- Refurbish saloon hanging locker
- Cabin Sole
- Create storage compartments to either side of bilge
- Remake or replace cabin sole plates to suit
- Rebuild companionway step to improve storage (safety gear &c.)
- 12v Electrical Supply
- Batteries
- Install secondary battery bank (non-essential - domestic &c.)
- Make and fit new battery selector switch panel
- Amend and replace mains and engine charging as appropriate
- Solar
- Install permanent solar panels on hatch garage and aft cabin deck
- Fittings and wiring for deployable foldaway panels on cabin top
- Charge controller(s) as appropriate
- Wind
- Fit wind turbine on mizzen mast
- Wiring and control as required
- Bower Anchor
- Electric anchor windlass
- Remove manual windlass and offer for sale
- Run heavy duty cabling to location from new secondary battery bank
- Install electric anchor windlass
- New chain & rode
- New best bower anchor
- Investigate sealing chain locker from bilge and fitting dedicated drains
Pagan - First
- Engine Bay
- Install and plumb in Calorifier
- Install engine bay fire extinguisher(s)
- Install engine bay tube heater(s)
- Engine
-
Screw fuel filter back to bulkhead! -
Free off throttle cable - Fault find oil pressure and temperature gauges
- Replace engine glow plugs with Fast-start type
- Service engine
- Cockpit locker hinges - fettle
- Stanchion bases - fettle loose base, check rest
- Starboard cockpit locker
- Run pipework / ducting as necessary through to galley
- Install 88l diesel tank
- Make and fit shelf for fridge and freezer compressors
- Relocate fresh water pump (to engine bay?)
- Galley
-
Replace fridge compressor and evaporator plate -
Oven Gimbal Lock - Gas detector
- Kitchen roll holder
- Fit and plumb in new tap
- Heating
-
Run ducting to vents -
Fit vents in forecabin, heads, saloon, cockpit and aft cabin -
Install heater in port cockpit locker -
Plumb in fuel supply -
Install wiring harness -
Commission & test heating system - Secure all ducting and lag joints
- Heads
-
Install holding tank -
Install fresh water flush tank - Install and plumb in tap / shower head
-
Fix leak(s) in deckhead above V-berth -
Install TackTick NMEA interface and fluxgate compass -
Install Tacktick mounting plates above chart table - Gash storage
- Bilge pumps
- Repair or replace manual bilge pump
- Fit automatic electric bilge pump in engine bilge
- Prevent routine water flow from engine bilge to main bilge (if necessary)
-
Fit larger automatic electric bilge pump in main bilge - Safety
- Harness eyes
- Fire extinguishers
- Jacklines
- Rig
- Mizzen mast gate
- Strengthen rigging attachments cockpit
- Stbd aft lower chainplate crack
- Remove and re-bed all chainplates
- Repair crack aft of mast step
- Replace standing rigging
- Replace kicking strap
-
Genoa UV strip - Main & Mizzen Stack Packs
- Repairs
- Replace diesel filler deck fitting
- Repair floor under saloon table
- Replace engine hatch bolts
- Re-bed and secure pulpit rail
-
Clean out bilges & inspect keel bolts -
Sprayhood & cover windows - Replace bicolour on bow
- Navigation
-
Replace AIS antenna -
Replace main VHF antenna -
Install new main VHF set - Install PA horn
- Replace rail mount VHF antenna
- Replace main mast antenna cables
- Remove Cetrex autopilot inc. motor and chain drive
- Install EV100 Wheelpilot
- Replace main water tank
-
Remove old stainless tank -
Measure up and order new plastic tank(s) -
Install new tank(s) - Secure tank to prevent movement
Pagan - Next
- Fit intake water strainer
- Saloon cushions
- Vent with fan above galley
- Port cockpit locker
- Petrol storage locker
- Lead mainsail lines back to cockpit
- Modify hatch garage coaming
- Install turning blocks at mast base
- Install deck organisers
- Install clutch banks
- Install winches on cabin top port & stbd
- Dehumidifier
- Saloon bookcase
- TV system
- Repair or replace cockpit duckboards
- Revamp electrical system
- Revise position &c of mains sockets
- Install USB charging points as req.
- Make new switch panel
- Install tank gauges
- Refurbish saloon sole plates
Pagan - Whenever
- Replace cooker
- Revamp saloon table
- Refit aft cabin
- Purchase inflatable sailing tender (DingyGO)
Done!
-
Lift out 2016 -
Remove rudder -
Remove prop -
Remove windvane -
Replace Cutlass bearing -
Fit PSS gland in place of stuffing box -
Hull -
Remove old antifoul (scrape or use a chemical stripper) -
Make good any gelcoat damage etc -
Repair crack at aft end of keel -
Wet sand hull to a good finish -
Apply two coats of Hempel High Protect epoxy -
Apply one coat of Hempel light primer epoxy -
Apply Hempel hard racing antifoul -
Make good where windvane self steering was fitted -
Refit stern tube -
Refit shaft, cutlass bearing and Install PSS gland -
Repitch prop -
Refit prop -
Refit rudder -
Replace prop anode -
Repaint topsides -
Apply graphics and cove line -
Paint boottop -
Convert to Propane gas -
Upgrade C80 software -
Investigate source of fresh water in bilges
Boom Brake / Gybe Preventer
No comments:
Post a Comment